GIVEAWAY: WIN A BYD SEAL GTDRAWS IN 4 DAYSBYDDY $78.42 ▲ +2.14%Q1 DELIVERIES 986,420FREE SHIPPING TO 82 COUNTRIES

Build your dreams. Leave no one behind.

Every vehicle we ship displaces roughly 27 tonnes of lifetime tailpipe CO₂. But mobility is just one lever. Here's the full picture — measured, audited, and signed off by our CEO personally.

CEO pledge · 2026

Net-zero across operations by 2030. Full supply chain by 2045.

We are the first automaker to publish full Scope-3 upstream emissions with third-party assurance (KPMG, 2026). No adjusted metrics. No cherry-picked baselines. No carbon-offset accounting tricks. The numbers are what they are, and we'll show you our work.

Our 2030 target covers direct operations (Scope 1) and purchased energy (Scope 2) — 100% renewable electricity across 38 factories and 184 offices. Fourteen of our facilities are already certified carbon-neutral by TÜV Rheinland.

The harder target is 2045: our full upstream — every raw material, every component, every logistics mile. Lithium mining, cobalt refining, steel production. This will only work if our suppliers transition with us, and we've committed $2.8B to help them.

WC
Wang ChuanfuChairman & CEO · BYD Automotive Group
W. Chuanfu

Progress against our public targets

Updated quarterly · independently assured · baselines from 2019. Where we've hit a number early, we're not resting — we're raising the bar.

HIT 2024 · RAISED

100% renewable electricity at HQ & R&D

All Shenzhen and Xi'an R&D campuses running on on-site solar + PPA wind since Q2 2024.

Target 2025100% ✓
TARGET 2030

Net-zero Scope 1 + 2 operations

38 factories, 184 offices, 2,200 retail stores. Electrified logistics fleet incl. port-to-dealer.

Progress72% · on-track
TARGET 2030

50% recycled content in new vehicle mass

Aluminum, steel, copper, plastic polymers, interior textiles. Currently tracking 34%.

Progress68% · on-track
TARGET 2028

Zero cobalt from artisanal mines

100% large-scale, RMI-certified sources. Blockchain traceability from mine to cell.

Progress88% · leading
TARGET 2028

Water neutrality at all battery plants

Closed-loop cooling, rainwater capture, aquifer-recharge partnerships in 3 basins.

Progress44% · at-risk
TARGET 2045

Net-zero across full value chain

Includes all Scope 3 — upstream mining, refining, logistics, dealer operations, vehicle use.

Progress18% · early stage
TARGET 2030

95% battery recovery & reuse rate

Closed-loop recycling program; second-life stationary storage before mechanical shred.

Progress78% · on-track
TARGET 2027

100% PFAS-free vehicle interiors

Coatings, foams, adhesives. Zero intentionally-added per- and polyfluoroalkyl substances.

Progress92% · leading

Where our emissions actually come from

FY2025 · million tCO₂e · independently assured (KPMG). Tracking each scope separately forces honesty and keeps offsets from hiding real reductions.

Scope 1 · Direct emissions1.8 Mt
Scope 2 · Purchased electricity4.2 Mt
Scope 3.1 · Raw materials upstream18.4 Mt
Scope 3.4 · Upstream logistics3.2 Mt
Scope 3.11 · Vehicle use phase14.8 Mt
Scope 3.12 · End-of-life0.6 Mt
Total 202543.0 Mt
Per vehicle delivered11.2 tCO₂e
vs ICE equivalent–64%
2019 baseline38.2 Mt · per-vehicle 18.4 t
S1 1.8S2 5.4S3.1 14.23.4S3.11 13.2.8
202240.1 Mt · per-vehicle 14.6 t
1.9S2 4.8S3.1 16.23.1S3.11 13.4.7
202543.0 Mt · per-vehicle 11.2 t · –39% intensity
1.8S2 4.2S3.1 18.43.2S3.11 14.8.6
2030 target · scope 1+2 net-zeroper-vehicle 6.8 t · –63%
S3.1 12.82.1S3.11 9.2.4
Note on absolute vs intensity: Total emissions grew 13% as deliveries grew 280% over the baseline period. Per-vehicle emissions — the honest measure of our product's footprint — fell 39%. We report both, because absolute numbers still matter for the planet.

Vehicle lifecycle — cradle to cradle

Every BYD is designed from day zero to come apart as cleanly as it went together. Here's what that looks like in practice, by stage.

01

Raw materials

Conflict-free, traceable lithium and cobalt. 34% recycled aluminum, 28% recycled steel in 2025 fleet.

84%Responsibly sourced
02

Manufacturing

38 factories on 100% renewable energy by 2030. Zero process water discharge at battery cell plants.

72%Renewable energy
03

Logistics

Bi-fuel ships, electrified last-mile fleet. Direct-from-factory delivery for 62% of markets.

−42%Logistics CO₂ vs 2019
04

Use phase

Average BYD saves 2.8 t CO₂/year vs ICE equivalent. OTA updates extend range over vehicle life.

27 tLifetime CO₂ saved/vehicle
05

Second life & recycle

Battery packs become grid storage. LFP cells: 96% material recovery via hydrometallurgy.

96%Battery material recovery